Sustainable Solutions for the Hydrogen Market’s Ramp-Up
Targeted regulatory adjustments and suitable funding instruments can support the ramp-up of the hydrogen market by improving production conditions, enabling long-term offtake and facilitating the development of viable market structures.
The expansion of electrolysis capacity in Germany is falling short of initial expectations. High hydrogen production costs, regulatory uncertainty and a lack of long-term offtake agreements are making investment decisions more difficult across the entire value chain. Within the Cooperation Forum Electrolysis, these challenges were analyzed jointly and three building blocks for potential solutions were developed.
Adapt Electricity Sourcing Criteria to the Market Ramp-up Phase
The RFNBO electricity sourcing criteria increase hydrogen production costs and constrain both electricity procurement and the operation of electrolyzers. Participants in the Cooperation Forum estimate that the resulting additional costs for projects in Germany average around €2.1/kg H₂. The European review process provides an opportunity to align the requirements more closely with the needs of the market ramp-up phase. Postponing the additionality requirement until 2035 and retaining monthly temporal correlation until at least 2035 are considered key adjustment options. These changes could improve project feasibility without compromising the fundamental objectives of the electricity sourcing criteria.
Establish a Reliable Special Grid Tariff for Electrolysers
With the current grid tariff exemption coming to an end, the contribution of electrolysers to grid financing needs to be redefined. The special grid tariff for green and low-carbon hydrogen proposed in the AgNes draft determination provides a suitable basis for the future grid tariff system. A tariff based solely on capacity limits the additional cost burden, avoids consumption-based charges and takes account of the operating constraints already imposed by the RFNBO electricity sourcing criteria. The initially proposed decision not to introduce dynamic grid tariffs should be maintained. If dynamic grid tariffs are introduced at a later stage, their application to existing projects should remain voluntary.
Close the Cost Gap and Enable Long-term Offtake
Hydrogen offtake, particularly in industry, is constrained by the cost gap compared with fossil alternatives and the lack of long-term offtake agreements. Existing instruments address these two challenges only partially. The solution developed in response is a two-stage double-auction mechanism that combines financial support with market organization. In the first stage, a public or publicly mandated intermediary brings supply and demand together through competitive auctions and secures long-term offtake agreements on the producer side. As market liquidity increases, private-sector midstream companies are expected to gradually assume a larger role in market organization, while the government continues to address the remaining cost gap. This approach can enable investment in electrolysis capacity and support the development of viable market structures.