Grid Connection and Integration of New Consumers and Storage Systems

The Cross-Sector Forum brings together the perspectives of grid operators and the five FfE Cooperation Forums. Sector-specific workshops, background discussions and cross-sector workshops provided a platform for discussing key challenges and jointly developing solution components for grid connection and grid integration. 

Rethinking Grid Connection: Solutions for New Consumers and Storage Systems 

Grid connection is increasingly becoming a bottleneck in the energy transition. The electrification of industry and logistics, together with the growth of data centres, electrolysers and battery storage systems, is leading to a rising number of grid connection requests. At the same time, planning, permitting and grid expansion are often unable to keep pace with this momentum. In the Cross-Sector Forum “Grid Connection and Integration”, grid operators, companies and project developers discussed how connection processes can be made more efficient and how existing grid capacity can be used more effectively. The discussion paper consolidates the key findings and assesses potential solutions from the perspectives of different sectors. 

Transparency, Dialogue and New Grid Connection Procedures 

Many challenges arise even before a formal grid connection request is submitted. Customers need reliable information about available capacity, costs and implementation timelines at an early stage. Grid operators, in turn, need to estimate future demand, even though many projects are still at an early stage of development. The discussion paper shows how regional grid dialogues, independent grid connection advisory services and more transparent information on available capacity could improve planning certainty for both sides. Criteria-based grid connection procedures could also help to give greater consideration to project maturity and the likelihood of implementation. A gradual allocation of grid connection capacity over time would make it possible to provide capacity in line with a project’s actual progress. 

Figure 1: Key challenges in the current grid connection situation from the perspectives of grid operators and connection customers

Flexibility for More Efficient Grid Integration 

In addition to grid expansion, the more efficient use of existing grid capacitiy is becoming increasingly important. Flexible Connection Agreements (FCAs) can enable projects to connect earlier if the available capacity may be temporarily limited. Co-location concepts offer further potential by allowing generation assets, storage systems and consumers to share a grid connection. Both approaches can help improve the utilisation of existing infrastructure and accelerate the integration of additional assets. However, important questions remain regarding standardisation, economic predictability, risk allocation, and technical and regulatory implementation. 

Figure 2: Solution components for the grid integration of new consumers

Different Sectors Require Different Solutions 

A key finding of the Cross-Sector Forum is that there is no one-size-fits-all solution for all customers. Battery storage systems and electrolysers offer comparatively high flexibility potential. This generally provides greater scope for integrating these technologies through FCAs and co-location concepts. However, whether these approaches are technically and economically viable depends on their specific design and the respective business model. 

For industrial companies and data centres, by contrast, planning certainty, security of supply and early coordination with the grid operator are often more important. In electrified logistics, the suitability of FCAs depends particularly on operational processes, charging profiles and available vehicle dwell times. The discussion paper therefore compares the project timelines, connection capacities, flexibility potential and locational constraints of the five sectors considered. This highlights which solution components are particularly relevant for the respective use cases. 

A Shared Design Challenge 

Advancing grid connection and grid integration requires not only regulatory adjustments, but also practical experience, shared learning processes and continuous dialogue between grid operators and customers. The discussion paper presents concrete solutions while also identifying outstanding design questions. It thus provides a basis for further cross-sector discussion on how grid connection procedures can be made more efficient, predictable and non-discriminatory.